Menü
Foundation Construction Train
Track Foundations with HERING

Foundation Construction Train

New and special civil-engineering technology for railway construction

Highest track availability and short shut-down times, challenging geographies and confined spaces demand know-how, experience and high-performance as well as approved special civil-engineering technology for railway construction. That’s why we joined forces with Kirow Ardelt, the global market leader for railway cranes, and RTG Rammtechnik (BAUER Maschinen Group), the specialist for vibration, pile-driving and pressing, to develop a high-performance track-foundation laying train. With special set-up procedures and tool logistics as well as high foundation-laying performances, quality and speed, the rail-mounted carrier adapts special civil engineering processes that are employed in the field of railway construction and guarantees the sustainable, safe and cost-effective fulfilment of your requirements.

Track foundations with equipment by HERING

  • Vibration-free drilling of holes with diameters of up to 1350 mm
  • MR 105 V (SilentVibro) vibrator for the high-frequency vibrating of sheet-piling profiles of lengths of up to 15 metres
  • HRS 5 hydraulic hammer for pile driving lengths of up to 12,20 metres
  • MPU 660 sheet-piling press or MPZ for pressing sheet pilings, Z-profiles, U-profiles and light profiles of up to 15 metres in length
Vorschaubild YouTube Video
Foundation Construction Train: The Revolution!

FIELDS OF APPLICATION – WITHOUT CONSTRUCTION ROAD

  • Realisation of bored piles using the Kelly drilling method for overhead line masts, signal brackets, noise barriers, etc.
  • Vibrating / pressing of sheet piling for securing excavations and stabilising railway embankments as well as installing girders for Berlin shoring, etc.
  • Driving in of concrete piling and casing pipes using the HRS5 hydraulic hammer
  • Installation of vibro-replacement stone columns for ground improvements in or near tracks (VIPAC method)
     

PERSPECTIVELY:

  • Production of bored piles using the rigid-cast-in-place method
  • Boring of cased and overlapping piles for bridge foundations and overlapping bored pile walls (front-of-wall method)
  • Realisation of single columns / diaphragm walls using the cutter-soil-mixing (CSM) and CSM DH methods as ground-improvement measures
  • Down-the-hole (DTH) hammer for drilling in rock

 

Foundation Construction Train - details:

  • Rail-mounted carrier equipment
  • Leader for use with special civil-engineering tools (vibrator, sheet-piling press, hydraulic hammer, kelly drilling equipment, etc.)
  • Comprehensive system consisting of a carrier unit, flat-bed carriage for storing the leader and additional flat-bed carriage for transporting and setting up attachments
  • Extends up to 9,50 metres from the track axis
  • Use in superelevations of up to 160 mm
  • Hydraulic rams for support distances of up to four metres from the track axis
  • 360° swivelling around the upper carriage axis
  • Operation that keeps the opposite track free: maximum protrusion of upper carriage from the track axis is 1.55 metres
  • High foundation-laying performances, quality and speed

Heavy duty machinery and Foundation Construction Train: News

Right Rhine Corridor Upgrade: HERING Working Across 20 Construction Sites

From 10 July to 12 December 2026, the railway line between Troisdorf and Wiesbaden will undergo comprehensive modernisation as part of the “Right Rhine” corridor upgrade. During the complete line closure, numerous construction measures will be carried out simultaneously to improve the long-term capacity and reliability of this heavily used rail infrastructure.

The HERING Group is involved as a subcontractor, with three companies delivering a broad range of services across a total of 20 construction sites. Our teams are carrying out work on platforms, pedestrian underpasses, stairways, platform canopies and foundations. The accompanying map provides an overview of the individual locations.

HERING is contributing railway construction, modular platforms, platform canopies and foundation engineering services across 20 sites as part of the Right Rhine corridor upgrade.

Three HERING Companies Combining Their Expertise

HERING Bahnbau: Comprehensive Modernisation of Passenger Stations

HERING Bahnbau GmbH is responsible for the removal and reconstruction of conventional platforms at several stations. The scope also includes the refurbishment of pedestrian underpasses and stairways, the construction of new enclosures and the renovation of platform canopies, including listed historic structures. The services include:

  • Removal and reconstruction of conventional platforms
  • Partial demolition and refurbishment of pedestrian underpasses
  • Refurbishment of stairways
  • Construction of new enclosures
  • Refurbishment of platform canopies and listed historic roof structures
  • Work on stormwater storage channels

Find out more about HERING railway construction and passenger station modernisation
 

HERING Infrastructure Systems: Modular Platforms and Platform Canopies

HERING Infrastructure Systems is designing, manufacturing, delivering and installing modular platforms and platform canopies at several locations. In addition to new construction, the contract includes the extension and subsequent raising of existing platforms. The scope of services includes:

  • Design, manufacture, delivery and installation of modular platforms
  • Design, manufacture, delivery and installation of platform canopies
  • Extension of existing platforms
  • Raising of existing platforms

Discover HERING modular platform systems  |  Find out more about our platform canopies
 

HERING Grundbau: Stable Foundations for Rail Infrastructure
 

HERING Grundbau GmbH is constructing the required foundations at several sites. Depending on the location and structural requirements, a range of drilling and piling methods will be used. The services include:

  • Drilling operations
  • Construction of bored piles
  • Installation of driven piles
  • Construction of gravel piles

Find out more about our foundation engineering services and Foundation Construction Train


20 Construction Sites Along the Right Rhine Railway

HERING Group teams will be working at locations including Troisdorf, Bonn-Beuel, Unkel, Erpel, Braubach, Lahnstein, Kaub, Lorch, Eltville and several sites in Wiesbaden. The collaboration between HERING Bahnbau, HERING Infrastructure Systems and HERING Grundbau brings together a wide range of expertise within the HERING Group. From foundation engineering and conventional railway construction to the delivery and installation of prefabricated platform and canopy systems, the individual services are closely coordinated.

The “Right Rhine” corridor upgrade is one of the major infrastructure projects of 2026. We are delighted that our teams and solutions are making an important contribution to modernising the railway infrastructure between Troisdorf and Wiesbaden.

EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Actually, for the first time, we published a sustainability report with an integrated environmental statement in accordance with EMAS - a logical next step in view of our ecological and social responsibility. It documents how we deal internally and externally with the issues that are essential to our future viability.

Exhibitions / Events

Right Rhine Corridor Upgrade: HERING Working Across 20 Construction Sites

From 10 July to 12 December 2026, the railway line between Troisdorf and Wiesbaden will undergo comprehensive modernisation as part of the “Right Rhine” corridor upgrade. During the complete line closure, numerous construction measures will be carried out simultaneously to improve the long-term capacity and reliability of this heavily used rail infrastructure.

The HERING Group is involved as a subcontractor, with three companies delivering a broad range of services across a total of 20 construction sites. Our teams are carrying out work on platforms, pedestrian underpasses, stairways, platform canopies and foundations. The accompanying map provides an overview of the individual locations.

HERING is contributing railway construction, modular platforms, platform canopies and foundation engineering services across 20 sites as part of the Right Rhine corridor upgrade.

Three HERING Companies Combining Their Expertise

HERING Bahnbau: Comprehensive Modernisation of Passenger Stations

HERING Bahnbau GmbH is responsible for the removal and reconstruction of conventional platforms at several stations. The scope also includes the refurbishment of pedestrian underpasses and stairways, the construction of new enclosures and the renovation of platform canopies, including listed historic structures. The services include:

  • Removal and reconstruction of conventional platforms
  • Partial demolition and refurbishment of pedestrian underpasses
  • Refurbishment of stairways
  • Construction of new enclosures
  • Refurbishment of platform canopies and listed historic roof structures
  • Work on stormwater storage channels

Find out more about HERING railway construction and passenger station modernisation
 

HERING Infrastructure Systems: Modular Platforms and Platform Canopies

HERING Infrastructure Systems is designing, manufacturing, delivering and installing modular platforms and platform canopies at several locations. In addition to new construction, the contract includes the extension and subsequent raising of existing platforms. The scope of services includes:

  • Design, manufacture, delivery and installation of modular platforms
  • Design, manufacture, delivery and installation of platform canopies
  • Extension of existing platforms
  • Raising of existing platforms

Discover HERING modular platform systems  |  Find out more about our platform canopies
 

HERING Grundbau: Stable Foundations for Rail Infrastructure
 

HERING Grundbau GmbH is constructing the required foundations at several sites. Depending on the location and structural requirements, a range of drilling and piling methods will be used. The services include:

  • Drilling operations
  • Construction of bored piles
  • Installation of driven piles
  • Construction of gravel piles

Find out more about our foundation engineering services and Foundation Construction Train


20 Construction Sites Along the Right Rhine Railway

HERING Group teams will be working at locations including Troisdorf, Bonn-Beuel, Unkel, Erpel, Braubach, Lahnstein, Kaub, Lorch, Eltville and several sites in Wiesbaden. The collaboration between HERING Bahnbau, HERING Infrastructure Systems and HERING Grundbau brings together a wide range of expertise within the HERING Group. From foundation engineering and conventional railway construction to the delivery and installation of prefabricated platform and canopy systems, the individual services are closely coordinated.

The “Right Rhine” corridor upgrade is one of the major infrastructure projects of 2026. We are delighted that our teams and solutions are making an important contribution to modernising the railway infrastructure between Troisdorf and Wiesbaden.

Icon Social Media Auswahl