Prefabricated platforms modula® shift

For the subsequent level change of prefabricated platforms

With the modula® shift system, modula® platforms can optionally be changed in height at a later date without having to replace system components. This offers particular advantages if it is already known during the construction of a new platform that a different level will be required in the future than at the time of construction. In this way, the platform can be subsequently raised or lowered with the modula® shift system, cost-effectively and with minimal effort. For this purpose, the modula® shift spacer elements are simply inserted between the webs of the modula® platform and the foundation, adjusted and fastened so that the platform can be used again at the new level as soon as possible.

We are of course on hand to support you in the planning of your system platform projects. To achieve a project-related solution that is both economical and functional, we can provide you with planning aids such as sample plans and Revit component families in our digital planning catalogue. However, please do not hesitate to contact us in person if you have any questions or suggestions.

modula® shift - system advantages:

  • Most cost-effective option for subsequent modification of the access level
  • Time saving in planning
  • Very short overall construction time
  • Minimal obstruction to railway operations during assembly
  • Reduction of project costs through savings in securing and construction monitoring times as well as operating times and construction site logistics
  • Track safety and construction monitoring effort minimised
  • Work is possible during breaks or also during night-time shutdown periods.
  • Minimum possible extent of construction site logistics required
  • Reusability of all components / no disposal costs

System Platforms modula® : Latest Projects

modular system platform in Bad Cannstatt
750 metres of new platform slabs for Bad Cannstatt: HERING delivers modula®flex solution
Platform installation in Dattenfeld
Accessibility in Dattenfeld: Efficient Platform Elevations as a Pilot Project
Platform Roof in Bonn-Beuel
New Platform and Platform Roof in Bonn-Beuel Successfully Completed
Photo Brochure Complex Solutions
New Brochure Out Now: Complex Solutions for Railway Infrastructure
EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Here you can find our current environmental statement.

CSC Logo Silver

CSC-Certificate

As a confirmation of decades of research into solutions for producing resource-efficient concrete, HERING Bau GmbH & Co. KG Systeme received the CSC certification in silver for the first time in August 2024, with an outstanding score of 73.8%.

Icon Social Media Auswahl
Newsletter IconNewsletter