Menü
Structural Engineering
Railway Overpasses and Auxiliary Bridges

Railway overpasses and auxiliary bridges

One-stop railway construction

Construction of new railway overpasses along with rehabilitation and modernisation, the installation and removal of auxiliary track bridges as temporary supporting structures for maintenance measures as well as the logistically optimal implementation of crossing structures – HERING is your high-performance and reliable general contractor with 130 years of experience in the business of railway construction.

Cost-effective, innovative and reliable

As a pre-qualified contact partner for the entire field of construction of transport infrastructure in accordance with the DB-Netz AG’s EBA guidelines, we are able to deliver the best and individual solutions for engineering design, track construction, heavy-duty rail-mounted machinery, transport depots, logistics and system construction.

Always in focus: quality, maximum prevention of disruption and the most cost-effective solutions for track, transport lines, grade-separated crossings and crossing structures – also independent of the tender.

Railway overpasses and auxiliary bridges with HERING

  • Demolitions and construction of new railway overpasses using reinforced concrete as full and/or half frames with shallow / deep foundations
  • Construction of new railway overpasses with rolled girders in concrete, prestressed concrete superstructures, Preflex superstructures and steel superstructures
  • Installation and removal of auxiliary / track support bridges
  • Comprehensive cost-effective solutions (technical processing, earthworks and demolition work, reinforced concrete works, special civil-engineering works, roads and civil-engineering works)
  • Individual solutions, professional project management, specialised subcontractors and four-year warranty
  • Sub-grade protection layers with Granular Mixtures 1 and 2 (groundwater protection through proper disposal)

Why not get in touch with us? We will realise your construction project from pricing up to turnkey handover and the combination of quality, professional know-how and decades of experience for your individual requirements.

Specialist deep foundation drilling in Haan-Gruiten
Four Bored Piles for a Pedestrian overpass in Haan-Gruiten
Track construction crane with Turnout
Major Operation at Frankfurt Central Station: 34 Turnouts in Three Weeks
Image de l'article: InnoTrans 2026: HERING looks back on four intensive trade fair days
InnoTrans 2026: HERING looks back on four intensive trade fair days
HERING is contributing railway construction, modular platforms, platform canopies and foundation engineering services across 20 sites as part of the Right Rhine corridor upgrade.
Right Rhine Corridor Upgrade: HERING Working Across 20 Construction Sites
First Vectron Dual Mode for HERING
First Vectron Dual Mode for HERING

Exhibitions / Events

Aucun événement actuellement