Menü
Foundation Construction Train
Track Foundations with HERING

Reference projects

With special set-up procedures and tool logistics as well as high foundation-laying performances, quality and speed, the rail-mounted carrier adapts special civil engineering processes that are employed in the field of railway construction and guarantees the sustainable, safe and cost-effective fulfilment of your requirements.

HERING reference projects Foundation Construction Train:

Track foundations with equipment by HERING

  • Vibration-free drilling of holes with diameters of up to 1350 mm
  • MR 105 V (SilentVibro) vibrator for the high-frequency vibrating of sheet-piling profiles of lengths of up to 12 metres
  • HRS 5 hydraulic hammer for pile driving lengths of up to 12,20 metres
  • MPU 660 sheet-piling press or MPZ for pressing sheet pilings, Z-profiles, U-profiles and light profiles of up to 12 metres in length

Heavy duty machinery and Foundation Construction Train: News

Foundation Construction Train Installs Bored Piles for Noise Barriers in Trier

The HERING Grundbau GmbH team deployed its Foundation Construction Train in Trier. Working on behalf of infra-tec GmbH, the team installed a total of four bored piles, each with a diameter of 1,000 millimetres.

Foundation Construction Train Installs Bored Piles for Noise Barriers in Trier

Two of the piles were installed to a depth of 7.85 metres, while the other two reached a depth of 9.85 metres. The bored piles form the foundations for two torsion beams on which noise barriers will later be installed.

The project demonstrates exactly what the Foundation Construction Train was designed for: carrying out foundation work directly from the railway track, including at locations that are difficult to access using conventional methods. The system is particularly effective where space is limited, site conditions are challenging and track possession windows are short.

Thanks to the close cooperation and commitment of the team, the demanding foundation work was completed successfully. Many thanks to all colleagues at HERING Grundbau GmbH who contributed to the project.

 

More about HERINGs Foundation Construction Train

EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Actually, for the first time, we published a sustainability report with an integrated environmental statement in accordance with EMAS - a logical next step in view of our ecological and social responsibility. It documents how we deal internally and externally with the issues that are essential to our future viability.

Exhibitions / Events

Foundation Construction Train Installs Bored Piles for Noise Barriers in Trier

The HERING Grundbau GmbH team deployed its Foundation Construction Train in Trier. Working on behalf of infra-tec GmbH, the team installed a total of four bored piles, each with a diameter of 1,000 millimetres.

Foundation Construction Train Installs Bored Piles for Noise Barriers in Trier

Two of the piles were installed to a depth of 7.85 metres, while the other two reached a depth of 9.85 metres. The bored piles form the foundations for two torsion beams on which noise barriers will later be installed.

The project demonstrates exactly what the Foundation Construction Train was designed for: carrying out foundation work directly from the railway track, including at locations that are difficult to access using conventional methods. The system is particularly effective where space is limited, site conditions are challenging and track possession windows are short.

Thanks to the close cooperation and commitment of the team, the demanding foundation work was completed successfully. Many thanks to all colleagues at HERING Grundbau GmbH who contributed to the project.

 

More about HERINGs Foundation Construction Train