Max Hummel
Cleaning of the tram tracks in Brussels, Belgium.
Société des Transports Intercommunaux des Bruxelles
2022 – 2027
Construction site logistics and installation of torsion beams with 3 x KRC810 simultaneously
Tandem method with two KRC1200 in Gendron Celles, Belgium.
MFS and BLS wagons with ballast regulator (FCCS wagon).
Various crane operations
Tandem deployment for lifting work on bridge components
Parallel deployment – KRC 810 and EDK KRC 910 railway slewing cranes in tandem
Provision of a KRC910 crane to recover a derailed coal dust carriage
Passage renewal in Lengenwang/Bavaria
Assembly of partially glazed elevator frames in the Siegen station