Menü

Production of two island platforms type modula®

The reason for the measures was that the existing island platforms on an ICE line on the Göppingen – Plochingen section needed renewing. Replacement platforms were required to ensure adequate replacement access for rail customers while existing ICE platforms were being converted and that allowed disabled-friendly level access to the trains during the construction period.

Construction board

Goeppingen – Plochingen


Client:

DB Station & Service AG

Year of construction:

2019

Scope of work:

Production of two modula® island platforms

Type platform and dimensions L x W:

modula® Platform 1 length=105 m width=2.50 m
modula® Platform 2 length=695 m width=2.20 m
modula® Platform 3 length=400 m width=2.5 m
modula® Platform 4 length=400 m width=2.5 m

System Platforms modula® : Latest Projects

HERING Upgrades Platform in Sünching
HERING Upgrades Platform in Sünching – Reusing Existing Structure Saves Resources
Image de l'article: InnoTrans 2026: HERING looks back on four intensive trade fair days
InnoTrans 2026: HERING looks back on four intensive trade fair days
[Translate to English:] EPD Daten
EPD Verification for modula® Precast Platforms
HERING is contributing railway construction, modular platforms, platform canopies and foundation engineering services across 20 sites as part of the Right Rhine corridor upgrade.
Right Rhine Corridor Upgrade: HERING Working Across 20 Construction Sites
HERING at German Public Transport Day 2026
HERING at German Public Transport Day 2026
CSC Logo Gold

CSC-Certificate

As a confirmation of decades of research into solutions for producing resource-efficient concrete, HERING Bau GmbH & Co. KG Systeme received the CSC certification in gold for the first time in February 2026, with an outstanding score of 75,39 %.

Exhibitions / Events

Aucun événement actuellement