HERING Infrastructure Systems has installed two new EVOLUTION 2020 platform roofs at Büchen railway station. The aim was to seamlessly connect the new roof structures to the existing Zwiesel platform roofs, creating continuous weather protection for passengers.
The project included a Type 2.3 roof measuring 60 metres in length and 13 metres in width, as well as a Type 4 roof with a width of five metres. The different geometries of the new and existing structures presented particular challenges during planning and installation. Thanks to precise engineering and careful execution, the new roofs were successfully integrated into the existing station infrastructure.
Installation took place between January and March. In addition to the technical challenges, freezing temperatures and heavy snowfall made working conditions on site particularly demanding. Despite these difficulties, the project was completed successfully and on schedule, thanks to close coordination and the dedication of the installation team.
Photos: ©Andreas Lürding










![[Translate to English:] Bahnsteigdach Typ Evolution 2020 in Sinzig](/fileadmin/_processed_/6/b/csm_Sinzig_2529_960x480_96d45adbad.jpg)
![[Translate to English:] Bahnsteigdach Typ Zwiesel, Berlin Ostkreuz](/fileadmin/_processed_/5/1/csm_Berlin_Ostkreuz_0067_960x480_f433a4df01.jpg)


![[Translate to English:] Infrastrukturprojekt Müllheim](/fileadmin/_processed_/5/0/csm_M%C3%BCllheim_13_960x480_c3e166ef9b.jpg)