Menü
Foundation Construction Train
Track Foundations with HERING

Reference projects

With special set-up procedures and tool logistics as well as high foundation-laying performances, quality and speed, the rail-mounted carrier adapts special civil engineering processes that are employed in the field of railway construction and guarantees the sustainable, safe and cost-effective fulfilment of your requirements.

HERING reference projects Foundation Construction Train:

Track foundations with equipment by HERING

  • Vibration-free drilling of holes with diameters of up to 1350 mm
  • MR 105 V (SilentVibro) vibrator for the high-frequency vibrating of sheet-piling profiles of lengths of up to 12 metres
  • HRS 5 hydraulic hammer for pile driving lengths of up to 12,20 metres
  • MPU 660 sheet-piling press or MPZ for pressing sheet pilings, Z-profiles, U-profiles and light profiles of up to 12 metres in length

Heavy duty machinery and Foundation Construction Train: News

“Thor” Railway Slewing Crane in Action at Plathnerstrasse in Hanover

Maximum precision was required during the construction of the Plathnerstrasse railway overbridge in Hanover. At the centre of the operation was the heavy machinery team of HERING Bahnbau GmbH with the KRC 910 railway slewing crane, known as “Thor”.

[Translate to English:] Eisenbahndrehkran „Thor“ im Einsatz an der Plathnerstraße in Hannover

©xilo.de

The team’s task was to lift prefabricated track and switch elements, move them across the construction site and position them with millimetre accuracy. A specially designed lifting beam ensured that the heavy components could be picked up and transported safely.

Each stage of the operation was closely coordinated between the crane operator, the signallers and the other teams on site. Thanks to this precise cooperation, the track and switch elements were lifted safely and placed exactly in their intended positions.

The operation is an impressive example of how modern crane technology, experience and teamwork come together in demanding railway construction projects. Many thanks to our heavy machinery team and everyone involved for the successful operation.

“Thor” Railway Slewing Crane in Action at Plathnerstrasse in Hanover

©xilo.de

EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Actually, for the first time, we published a sustainability report with an integrated environmental statement in accordance with EMAS - a logical next step in view of our ecological and social responsibility. It documents how we deal internally and externally with the issues that are essential to our future viability.

Exhibitions / Events

“Thor” Railway Slewing Crane in Action at Plathnerstrasse in Hanover

Maximum precision was required during the construction of the Plathnerstrasse railway overbridge in Hanover. At the centre of the operation was the heavy machinery team of HERING Bahnbau GmbH with the KRC 910 railway slewing crane, known as “Thor”.

[Translate to English:] Eisenbahndrehkran „Thor“ im Einsatz an der Plathnerstraße in Hannover

©xilo.de

The team’s task was to lift prefabricated track and switch elements, move them across the construction site and position them with millimetre accuracy. A specially designed lifting beam ensured that the heavy components could be picked up and transported safely.

Each stage of the operation was closely coordinated between the crane operator, the signallers and the other teams on site. Thanks to this precise cooperation, the track and switch elements were lifted safely and placed exactly in their intended positions.

The operation is an impressive example of how modern crane technology, experience and teamwork come together in demanding railway construction projects. Many thanks to our heavy machinery team and everyone involved for the successful operation.

“Thor” Railway Slewing Crane in Action at Plathnerstrasse in Hanover

©xilo.de

Icon Social Media Auswahl