Reference projects

With special set-up procedures and tool logistics as well as high foundation-laying performances, quality and speed, the rail-mounted carrier adapts special civil engineering processes that are employed in the field of railway construction and guarantees the sustainable, safe and cost-effective fulfilment of your requirements.

HERING reference projects Foundation Construction Train:

Track foundations with equipment by HERING

  • Vibration-free drilling of holes with diameters of up to 1350 mm
  • MR 105 V (SilentVibro) vibrator for the high-frequency vibrating of sheet-piling profiles of lengths of up to 12 metres
  • HRS 5 hydraulic hammer for pile driving lengths of up to 12,20 metres
  • MPU 660 sheet-piling press or MPZ for pressing sheet pilings, Z-profiles, U-profiles and light profiles of up to 12 metres in length

Heavy duty machinery and Foundation Construction Train: News

Group photo of the HERING Bahnbau ECM team
ECM audit successfully passed!
InnoTrans Banner 2026
HERING at InnoTrans 2026 – Hall 25, Booth 365
BR218 Locomotive in HERING Design
New Look for “Hartmut” – Our BR218 in HERING Design
KRC 810 crane lifting an auxiliary bridge
Heavy Duty Crane Popeye KRC 810/4 in operation: Installation of a temporary auxiliary bridge
EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Actually, for the first time, we published a sustainability report with an integrated environmental statement in accordance with EMAS - a logical next step in view of our ecological and social responsibility. It documents how we deal internally and externally with the issues that are essential to our future viability.

Icon Social Media Auswahl