Foundation Construction Train
Track Foundations with HERING

Reference projects

With special set-up procedures and tool logistics as well as high foundation-laying performances, quality and speed, the rail-mounted carrier adapts special civil engineering processes that are employed in the field of railway construction and guarantees the sustainable, safe and cost-effective fulfilment of your requirements.

HERING reference projects Foundation Construction Train:

Track foundations with equipment by HERING

  • Vibration-free drilling of holes with diameters of up to 1350 mm
  • MR 105 V (SilentVibro) vibrator for the high-frequency vibrating of sheet-piling profiles of lengths of up to 12 metres
  • HRS 5 hydraulic hammer for pile driving lengths of up to 12,20 metres
  • MPU 660 sheet-piling press or MPZ for pressing sheet pilings, Z-profiles, U-profiles and light profiles of up to 12 metres in length

Heavy duty machinery and Foundation Construction Train: News

KRC910 during the lifting of the derailed locomotive
Special Operation in Sweden: KRC 910 Returns Derailed Locomotive to the Tracks
Specialist deep foundation drilling in Haan-Gruiten
Four Bored Piles for a Pedestrian overpass in Haan-Gruiten
Foundation Construction Train, Walluf
Rhine Right Corridor Rehabilitation: 39 Boreholes in Walluf
KRC1200-2 during bridge installation
Heavy-Duty Operation for IDEFIX in Karlsruhe-Durlach