Menü
Heavy-duty rail-mounted machines
Tamping machines

Tamping machines for precise track and switch construction

High-precision mechanised track maintenance

High-performance tamping machines are available for levelling, lifting, lining and tamping tracks, switches and crossings. They are used for the maintenance, repair and construction of railway track systems.

As a shareholder in Deutsche Gleisbau Union GmbH & Co. KG (DGU), the HERING Group provides reliable access to modern track and switch tamping machines for the efficient and cost-effective delivery of your construction project.

Vorschaubild YouTube Video

Modern tamping machines for mechanised track construction

The fleet includes continuously operating levelling, lifting, lining and tamping machines equipped with single- and multiple-sleeper tamping units. The high-performance machines from Plasser & Theurer enable precise correction of track geometry and help create stable, resilient and permanently safe railway infrastructure.

From deployment planning through to execution, you benefit from modern machinery, experienced specialists and professionally coordinated workflows.

The following track and switch tamping machines are available to meet your requirements:

  • WSM 08-275-3-SY switch tamping machines
  • WSM 08-475-4-S switch tamping machines
  • UNIMAT 09 – 4 X 4 / 4S combined track- and switch-tamping machine
  • USM 09-475-4S combined track- and switch-tamping machine
  • GSM 09-32 tamping machines

HERING Railway construction: Latest Projects

Specialist deep foundation drilling in Haan-Gruiten
Four Bored Piles for a Pedestrian overpass in Haan-Gruiten
Track construction crane with Turnout
Major Operation at Frankfurt Central Station: 34 Turnouts in Three Weeks
News image: InnoTrans 2026: HERING looks back on four intensive trade fair days
InnoTrans 2026: HERING looks back on four intensive trade fair days
HERING is contributing railway construction, modular platforms, platform canopies and foundation engineering services across 20 sites as part of the Right Rhine corridor upgrade.
Right Rhine Corridor Upgrade: HERING Working Across 20 Construction Sites

Exhibitions / Events

No dates at the moment
Icon Social Media Auswahl