Menü
HERING Railway Construction
Railway Station Solutions

Railway Station Solutions for Deutsche Bahn AG

Railway stations, stopping points and stops are important operating locations within Deutsche Bahn AG’s activities. The condition and proper functioning of platforms, staircases, ramps and underpasses make a significant contribution to the smooth running of railway infrastructures. Quality, reliability, punctual completion and the guarantee of safety in railway operations are therefore essential to the execution of required construction and refurbishment measures at railway stations and transport depots.

Railway Stations with HERING

  • Construction of all kinds of new transport depots and alterations to existing ones (barrier-free, turnkey, complex projects, temporary systems)
  • Cost-effective comprehensive solutions
  • Alternative products and construction methods
  • Turnkey fulfilment of your requirements
  • Experience and know-how for generations
  • Modern and powerful machinery
  • DB pre-qualifications

Construction of new railway stations and alterations to existing ones – all-in-one with HERING

We at HERING are your full-service provider in the field of railway station solutions. For generations, we have been thinking, planning and acting on a proactive and flexible basis while prioritising partner-like cooperation, transparency, trust and openness. Having been awarded many DB pre-qualifications and working with modern and high-performance machinery and a strong partner network as the foundation for smooth construction processes as well as optimised workflows, we think beyond the norm and are so not only able to offer cost-effective solutions but also alternative products and construction methods for building all kinds of new transport depots and carrying out reconstruction work at existing ones. The focus here is always on HERING’s turnkey and one-stop punctual, safe and optimum fulfilment of your requirements.

Specialist deep foundation drilling in Haan-Gruiten
Four Bored Piles for a Pedestrian overpass in Haan-Gruiten
Track construction crane with Turnout
Major Operation at Frankfurt Central Station: 34 Turnouts in Three Weeks
News image: InnoTrans 2026: HERING looks back on four intensive trade fair days
InnoTrans 2026: HERING looks back on four intensive trade fair days
HERING is contributing railway construction, modular platforms, platform canopies and foundation engineering services across 20 sites as part of the Right Rhine corridor upgrade.
Right Rhine Corridor Upgrade: HERING Working Across 20 Construction Sites
First Vectron Dual Mode for HERING
First Vectron Dual Mode for HERING

Exhibitions / Events

No dates at the moment
Icon Social Media Auswahl