Menü
Foundation Construction Train
Track Foundations with HERING

Reference projects

With special set-up procedures and tool logistics as well as high foundation-laying performances, quality and speed, the rail-mounted carrier adapts special civil engineering processes that are employed in the field of railway construction and guarantees the sustainable, safe and cost-effective fulfilment of your requirements.

HERING reference projects Foundation Construction Train:

Track foundations with equipment by HERING

  • Vibration-free drilling of holes with diameters of up to 1350 mm
  • MR 105 V (SilentVibro) vibrator for the high-frequency vibrating of sheet-piling profiles of lengths of up to 12 metres
  • HRS 5 hydraulic hammer for pile driving lengths of up to 12,20 metres
  • MPU 660 sheet-piling press or MPZ for pressing sheet pilings, Z-profiles, U-profiles and light profiles of up to 12 metres in length

Heavy duty machinery and Foundation Construction Train: News

Stable Foundations for Infrastructure in Offenburg

On behalf of our client Königbau, HERING Grundbau GmbH was deployed in Offenburg: At a total of three foundation locations, six driven piles were installed with precision to a depth of around ten metres using our Foundation Construction Train and the MR-105 V vibratory hammer.

Foundation Construction Train of HERING Grundbau GmbH

This work provides the reliable foundation for future signal gantries and makes an important contribution to a stable rail infrastructure.

A particular highlight of the project was the joint barbecue evening held directly on the construction site. Together with our client and the on-site team, the successful operation was celebrated in a relaxed atmosphere.

Moments like these demonstrate what successful collaboration is all about: trust, team spirit, and true partnership!

Find out more about our Foundation Construction Train.

Photo Collage of the Foundation Construction Train During Civil Engineering Works
EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Actually, for the first time, we published a sustainability report with an integrated environmental statement in accordance with EMAS - a logical next step in view of our ecological and social responsibility. It documents how we deal internally and externally with the issues that are essential to our future viability.

Exhibitions / Events

Stable Foundations for Infrastructure in Offenburg

On behalf of our client Königbau, HERING Grundbau GmbH was deployed in Offenburg: At a total of three foundation locations, six driven piles were installed with precision to a depth of around ten metres using our Foundation Construction Train and the MR-105 V vibratory hammer.

Foundation Construction Train of HERING Grundbau GmbH

This work provides the reliable foundation for future signal gantries and makes an important contribution to a stable rail infrastructure.

A particular highlight of the project was the joint barbecue evening held directly on the construction site. Together with our client and the on-site team, the successful operation was celebrated in a relaxed atmosphere.

Moments like these demonstrate what successful collaboration is all about: trust, team spirit, and true partnership!

Find out more about our Foundation Construction Train.

Photo Collage of the Foundation Construction Train During Civil Engineering Works
Icon Social Media Auswahl