
The first Evolution 2020 type roof was installed over platform 104/106 in Hanau. The roofing with a length of 130 m was built on behalf of HERING Bahnbau. Glass elements are located above the stairway. The second roof (also type Evolution 2020) with a length of 160 m will be built in spring 2022. Evolution 2020 was developed by HERING in cooperation with DB AG as a standardised and optimised roof system.
Photos: Andreas Lürding
HERING Bahnbau GmbH
2021/2022
Workshop planning and statics, manufacture, delivery and installation of 2 platform roofs, type Evolution 2020
2 x type Evolution 2020
Dimensions 130 m long (roof 1); 160 m long (roof 2)








![[Translate to English:] Bahnsteigdach Typ Evolution 2020 in Sinzig](/fileadmin/_processed_/6/b/csm_Sinzig_2529_960x480_96d45adbad.jpg)
![[Translate to English:] Bahnsteigdach Typ Zwiesel, Berlin Ostkreuz](/fileadmin/_processed_/5/1/csm_Berlin_Ostkreuz_0067_960x480_f433a4df01.jpg)


![[Translate to English:] Infrastrukturprojekt Müllheim](/fileadmin/_processed_/5/0/csm_M%C3%BCllheim_13_960x480_c3e166ef9b.jpg)













