At Munich East station, HERING installed two compact platform canopies of the Zwiesel type. The canopy solutions for platforms A and B integrate into the existing station infrastructure – under particularly challenging on-site conditions. Commissioned by Wadle Bauunternehmung, the two system roofs were built at Munich East station.
Both canopies measure 15.25 metres in length and 10.40 metres in width. The special challenge on site: the new roofs had to be installed between the existing platform canopies and above a Deutsche Bahn supervisor's cabin in each case.
A rail-mounted crane was used to position the roof structures exactly. Assembly required careful coordination and precise execution to fit the new canopies accurately into the confined space.
All works were completed within just six days.
Photos: ©Andreas Lürding







![[Translate to English:] Platform Canopy type Evolution 2020](/fileadmin/_processed_/6/8/csm_B%C3%BCchen_1726_960x480_9ac9216310.jpg)
![[Translate to English:] Bahnsteigdach Typ Evolution 2020 in Sinzig](/fileadmin/_processed_/6/b/csm_Sinzig_2529_960x480_96d45adbad.jpg)
![[Translate to English:] Bahnsteigdach Typ Zwiesel, Berlin Ostkreuz](/fileadmin/_processed_/5/1/csm_Berlin_Ostkreuz_0067_960x480_f433a4df01.jpg)


![[Translate to English:] Infrastrukturprojekt Müllheim](/fileadmin/_processed_/5/0/csm_M%C3%BCllheim_13_960x480_c3e166ef9b.jpg)