Max Hummel
Tandem deployment for lifting work on bridge components: in conjunction with the KRC1600 from Swietelsky Rail.
Further details can be found on the construction site sign.
DB Netz AG
09/2022
Cleaning of the tram tracks in Brussels, Belgium.
Construction site logistics and installation of torsion beams with 3 x KRC810 simultaneously
Tandem method with two KRC1200 in Gendron Celles, Belgium.
MFS and BLS wagons with ballast regulator (FCCS wagon).
Various crane operations
Tandem deployment for lifting work on bridge components
Parallel deployment – KRC 810 and EDK KRC 910 railway slewing cranes in tandem
Provision of a KRC910 crane to recover a derailed coal dust carriage
Passage renewal in Lengenwang/Bavaria
Assembly of partially glazed elevator frames in the Siegen station