Menü
HERING heavy-duty machinery
Successful projects

Reference project for heavy machinery: Immediate action: passage renewal in Lengenwang/Bavaria

As the name suggests, taking immediate measures requires prompt action. For DB Netz AG, Hering provided a track-bound slewing crane and a work train locomotive with two rail wagons as part of a passage renewal. In addition, a logistical concept has been drawn up to ensure that the work is carried out.

Further details can be found on the construction panel.

Construction panel

Immediate action: passage renewal in Lengenwang, Bavaria

Provision of a track-bound slewing crane KRC810T for the lifting of the steel frame in the course of a passage renewal


Client:

DB Netz AG

Completion period:

Construction phase 1: End of February 2018
Construction phase 2: Mid-March 2018

Scope of services:

Provide track-bound slewing railway crane for lifting in the new passage parts
Later expansion to include a work train locomotive with two rail wagons & provision of a logistics concept
 

Particularities:

Frequently used single-track line with up to 2.5% steep routing with traffic signalised train control operation
Passage with 38 t unit weight, reinforced concrete structure, cross-section of approx. 2x2.5 m
The construction site cannot be reached by heavy goods vehicles
Temperatures of down to minus 17°C during the first shutdown period

Reference projects:

Machinery from HERING

  • Specialist for hiring out heavy-duty rail-mounted machines
  • Europe’s largest fleet of railway slewing cranes
  • Planning and implementation of logistics concepts
  • Prevention of shut-downs and interruptions to services
  • Workshop service
  • Individual solutions and immediate measures
  • Strong network of partners
  • Modern and powerful machinery
  • Professional project management
  • Building information modelling
  • Pre-qualified, competent and reliable
EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Actually, for the first time, we published a sustainability report with an integrated environmental statement in accordance with EMAS - a logical next step in view of our ecological and social responsibility. It documents how we deal internally and externally with the issues that are essential to our future viability.

Icon Social Media Auswahl