Menü
HERING heavy-duty machinery
Successful projects

Reference project for heavy machinery: Assembly of partially glazed elevator frames in the Siegen station

For the company Hohrenk Systemtechnik GmbH, Hering realised the lifting of new elevator frames for DB AG in the course of the redesign of the Siegen railway station.

Further details can be found on the construction site sign.

Construction panel

Assembly of partially glazed elevator scaffolding in the Siegen station  


Provision of a track-bound KRC910T slewing railway crane for the hoisting of shaft frames


Client:

Hohrenk Systemtechnik GmbH

Completion period:

Construction phase 1: 24/04/2018
Construction phase 2: 02/05/2018

Scope of services:

Provision of railway slewing crane for lifting in the new elevator frames including roof construction;
Including intermediate transport on SKL trailers
Dimensions of the elevator frames: 3.30 / 2.60 / 13.60 m (W/L/H)
Weight of the elevator frames: max. 10 t

Particularities:

Assembly and handling of partially glazed elevator frames in cramped local conditions.
Creation of a logistics concept for both construction phases.

Reference projects:

Machinery from HERING

  • Specialist for hiring out heavy-duty rail-mounted machines
  • Europe’s largest fleet of railway slewing cranes
  • Planning and implementation of logistics concepts
  • Prevention of shut-downs and interruptions to services
  • Workshop service
  • Individual solutions and immediate measures
  • Strong network of partners
  • Modern and powerful machinery
  • Professional project management
  • Building information modelling
  • Pre-qualified, competent and reliable
EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Actually, for the first time, we published a sustainability report with an integrated environmental statement in accordance with EMAS - a logical next step in view of our ecological and social responsibility. It documents how we deal internally and externally with the issues that are essential to our future viability.

Icon Social Media Auswahl