Production of a side-boarding platform using the modula® design

The Rhine-Ruhr region is to be more closely linked with the Rhine-Ruhr Express (RRX). Hering’s platform was installed at route number 2270 RRX, Outer Branch 5, at the Holten stop as part of the expansion and conversion measures for the rail infrastructure in June 2019. The components for the 220-metre-long system platform were delivered by truck; the foundations were assembled using a mobile crane and the elements were installed with a tracked crane.

Special features:  The stays for the overhead lines meant that it was necessary to use telescopic cranes that could be extended under load. It also deserves mention here that the tracked crane was able to travel while the parts that had been prefabricated by Hering were lifted. That wouldn’t have been possible with a mobile crane as they need to be supported. The tracked crane made it possible for the elements – which weighed up to 14 tonnes – to be moved effortlessly in parallel behind the platform and installed at the appropriate height and intended location.

Construction board

HERING modula® side-boarding platform for RRX outer branch Oberhausen-Holten stop


Client:

DB S&S construction projects

Year of construction:

2019

Scope of work:

Production of a side-boarding platform using the modula® design

Type platform and dimensions L x W :

modula® platform length = 220 m, width = 3.00 m

 

System Platforms modula® : Latest Projects

HERING at German Public Transport Day 2026
HERING at German Public Transport Day 2026
System platform in Enzberg
Tailor-Made Platform Solution at Enzberg Station
CSC-Certification Gold
CSC Gold Certification for the HERING Precast Concrete Plant
InnoTrans Banner 2026
HERING at InnoTrans 2026 – Hall 25, Booth 365
EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Here you can find our current environmental statement.

CSC Logo Gold

CSC-Certificate

As a confirmation of decades of research into solutions for producing resource-efficient concrete, HERING Bau GmbH & Co. KG Systeme received the CSC certification in gold for the first time in February 2026, with an outstanding score of 75,39 %.

Exhibitions / Events

Icon Social Media Auswahl