Production of two modula® side-boarding platforms

A total of 89 prefabricated elements for two Hering modula® side-boarding platforms were delivered by truck to Hamburg for Ed. Züblin AG, Hamburg. Hering’s prefabricated elements were all unique without repetition factor because the track is located in an area with a steep longitudinal gradient as well as a curve, which made the designing and production work a significant challenge.

Colleagues from the Hering Group had already been deployed with the KRC 910 slewing railway crane to Hamburg’s youngest district in autumn 2018. This crane from Hering’s fleet was used to commence the unloading and lifting in of the platform elements at the newly built ‘Elbbrücken’ urban-railway stop.

The new district is being linked up to the local transport system. A 70-metre-long pedestrian bridge connects the new urban-railway stop to the existing subway stop. The two side-boarding platforms with lengths of 265 metres and 252 metres were completed at the end of March.

 

Construction board

Hafencity - Elbbrücken District


Client:

Ed. Züblin AG, Hamburg

Year of construction:

2017

Scope of word:

Production of two modula® side-boarding platforms

Type platform and dimensions L x W :

modula® Platform 1 length=202 m width = 3.00 m
modula® Platform 2 length=202 m width = 3.00 m
modula® Platform 3 length=62 m width = 3.00 m
modula® Platform 4 length=62 m width = 3.00 m

System Platforms modula® : Latest Projects

HERING at German Public Transport Day 2026
HERING at German Public Transport Day 2026
System platform in Enzberg
Tailor-Made Platform Solution at Enzberg Station
CSC-Certification Gold
CSC Gold Certification for the HERING Precast Concrete Plant
InnoTrans Banner 2026
HERING at InnoTrans 2026 – Hall 25, Booth 365
EMAS-Logo

HERING sustainability

At HERING, we see ourselves as pioneers in the field of sustainability. As early as 1996, we were the first construction company in Germany to obtain EMAS certification. Every three years, we publish an environmental statement documenting our goals and how we have achieved them. Here you can find our current environmental statement.

CSC Logo Gold

CSC-Certificate

As a confirmation of decades of research into solutions for producing resource-efficient concrete, HERING Bau GmbH & Co. KG Systeme received the CSC certification in gold for the first time in February 2026, with an outstanding score of 75,39 %.

Exhibitions / Events

Icon Social Media Auswahl